• HOME
  • PROJECTS
  • CONTACT US
  • More
    • HOME
    • PROJECTS
    • CONTACT US
  • HOME
  • PROJECTS
  • CONTACT US

Public and Community Projects

City of Darien | Butler Plantation, Darien, GA

Demolition and reconstruction of a covered pier (piling) supported stationary dock with seating, aluminum gangway and floating dock. This included removal and reconstruction of roof structure, new piers, new decking, installation of two kayak launches and other related work. The project also included site improvements consisting of minor grading, construction of parking lot fence, supplemental graded aggregate base and related work as shown on the plans, notes and details. Price included all mobilization and material acquisition and disposal. Contractor maintained a clean, orderly job site. Project completed on time and on budget. 

South East Connections | Butler River Bridge, Darien, GA & MacKay River Bridge, Saint Simons, GA

Removal and disposal of 2,000’ +/- of schedule 8 old gas pipe. Contractor provided safety measures during work on the project to protect the public. Contractor maintained a clean, orderly job site. Project completed on time and on budget.

Friends of South Newport River | Townsend, GA

Constructed a walkway with handrails, installed an aluminum gangway leading to a floating dock system with a kayak launch. Price included all mobilization and material acquisition and disposal. Contractor maintained a clean, orderly job site. Project completed on time and on budget. 

Geosyntec Consultant/Engineer Inc. for Pinova Inc. (formerly Hercules Inc.) Brunswick, GA

The project site is a CERCLA/Superfund site. Contractor used methods that minimized the disturbance of soils/sediment and avoided personnel coming into contact with soils/sediments. Removed existing Terry Creek Dock project failed components. Installed new walkway with handrails, pilings, aluminum gangway/ramp and floating dock. Price included all mobilization and material acquisition and disposal. Contractor maintained a clean, orderly job site. Project completed on time and on budget.

Tybee Island Pier & Pavilion Stair Replacement | Chatham, GA

Demolition of existing stair system in its entirety and the construction of a new timber stairway including installation of light fixtures. The lights were reconnected to the existing electrical services currently in place. During the demolition and construction the pavilion remained in use by the public. Contractor provided safety measures during work on the project to protect the public at the stair entrance location on the pier and on the beach. Project completed on time and on budget. 

Sapelo Island, GA

Sapelo Island Wildlife Resource Division(WRD) of DNR Boat slips – Installed piling, addressed gangway approach, Fixed roof joists, removed failed metal roof and installed a new metal roof over the multi-slip boat storage facility. Project completed on time and on budget.

Sapelo Island Ferry Landing – Reinforced dolphin at ferry landing. Project completed on time and on budget.

Sapelo Island Community Dock Project – Restored community dock to a pre storm condition. Pile replacement, installation of new bents and bring dock back straight. 

Butler Plantation | Darien, GA

Restored the areas effected by hurricanes to pre-hurricane status. The affected areas were a new fixed dock at the Butler Island Plantation Dock. Restored and stabilized the bank at the Butler Island Plantation Kayak Dock and Pavilion. Constructed flood control gates and installed wing walls at multiple Altamaha Waterfowl Management Areas. Constructed a new public fixed dock adjacent to Hxy 17. Price included all mobilization and material acquisition and disposal. Contractor maintained a clean, orderly job site. Project completed on time and on budget.  

Cabretta Bridge Rebuild | Sapelo Island, GA

Restored closed timber bridge to occupiable status. This was determined by EMC Engineering. Set bridge level and even, piling installation, repair bulkhead, install dead men, piling and stainless cable installation, tamped backfill, replaced damaged bridge railing, removed and replaced drive boards. 

Request project references

Project Gallery

    Testimonials

    Pavillion

    Villas By The Sea 2018 | Jekyll Island, GA

    I am writing this letter to attest to the high level of professionalism, quality of work, and attention to detail that CWA Development has modeled in all their work for Villas by the Sea. After receiving a great deal of storm damage, CWA Development:

    • Reconstructed our pavilion with seating, fortifying the substructure to safely accommodate large social functions;
    • Replaced a walkway from the land to the pavilion;
    • Replaced a walkway with a staircase that led from the pavilion to the beach, crossing over boulder shoreline protection.


    They follow through with the contracted work to the letter, meeting all deadlines and leaving the cost fixed at what we originally agreed to.

    I sincerely recommend this company for work with all dock related projects. You may reach me by phone or email to answer any questions related to my referral.


    Regards, 

    Jerry Davidson

    Connect With Us

    • HOME
    • PROJECTS
    • CONTACT US

    CWA Development, Inc.

    1082 Midway Street NE, Townsend, GA 31331

    (912) 832-3848 | (912) 270-3625

    Copyright © 2020 CWA Development, Inc.

    Powered by